Residents can earn money by building photovoltaic power generation on their roofs and connecting to

Issuing time:2017-09-21 14:46

On September 14th, the Dongguan Development and Reform Bureau released the draft

for soliciting opinions on the "Interim Measures for the Construction and Management

of Distributed Photovoltaic Power Generation Projects in Dongguan City"

(hereinafter referred to as the "Measures"), publicly soliciting opinions from citizens.

The method requires simplifying relevant procedures to further standardize distribution

The construction and management of photovoltaic projects promote the healthy and

healthy development of the photovoltaic industry.

Simplify the integration of residential projects into the grid.

Distributed photovoltaic power generation projects refer to the construction of a

distribution network with a voltage level below 35 kV at or near the user's site,

in accordance with the

Photovoltaic power generation facilities that operate under the mode of "self use and

surplus electricity grid connection" and have the characteristics of balancing and

regulating the distribution network system, but

Brick-concrete structural supports or equipment rooms erected without authorization

on the roof are not considered photovoltaic project facilities.

The Development and Reform Bureau implements a record keeping system for

distributed photovoltaic power generation projects based on their permissions,

and follows the principles of "build first, distribute first" and "adopt this system

The principle of "priority distribution of main materials in the city" refers to the

completion of registration and filing of enterprise distributed photovoltaic projects,

completion of construction, and compliance with the merged network inspection

After receiving the conditions, the projects will be included in the quota management

scope in sequence according to the issuance timing of the grid connection acceptance

opinion form.

The construction of residential distributed photovoltaic projects shall be registered

with Dongguan Power Supply Bureau after meeting the acceptance conditions. For

using this city

The projects of photovoltaic modules and inverters produced by enterprises

(or headquartered in this city) shall be prioritized and included in the quota

management scope. For residents

Distributed photovoltaic power generation project utilizing self owned residential

buildings and constructing electricity in residential areas for residential use, Dongguan

Power Supply Bureau

Follow the simplified procedures to handle the grid connection procedures, and in

principle, the processing deadline should not exceed 45 working days.

Must have real-time monitoring function

Distributed photovoltaic project construction enterprises must be registered in

Dongguan City with independent legal personality and have completed the project

within the jurisdiction of Dongguan City

Photovoltaic projects with a construction installed capacity exceeding 1 megawatt or

photovoltaic projects with a cumulative completed construction installed capacity

exceeding 1.5 megawatts.

The production enterprises of solar modules used in project construction must enter

the list of the Ministry of Industry and Information Technology or pass the TUV

international product certification for their products

Quality certification, and must be of A-grade quality, with the photoelectric conversion

rate of the thin film not less than 12%, and a 10-year process warranty must be provided

And a limited warranty of no less than 80% of rated power for 25 years. The inverter

must be certified by a certification agency approved by the National Certification and

Accreditation Administration

Products that meet the standards and provide a warranty of no less than 5 years.

Distributed photovoltaic projects must have real-time monitoring capabilities, and

relevant information such as power generation must have the ability to access mobile

device apps.

The construction unit of the project shall inspect and record the safe operation of the

completed project every six months for five consecutive years. Municipal Development

and Reform Commission

The bureau is responsible for industry regulatory responsibilities, overseeing the

implementation of corporate entity responsibilities by distributed photovoltaic

construction enterprises throughout the city, and addressing issues related to

incomplete enterprises

Organizations that manage safety and cause serious consequences will be punished

by notification, criticism, and other penalties depending on the severity of the situation.

Both grid connection and operation are free of charge

The method states that the scope, standards, and procedures of the special fund

subsidy for distributed photovoltaic projects shall be in accordance with the annual

distributed photovoltaic project subsidy in Dongguan City

The application notice for project fund subsidies and the corresponding special fund

management measures shall be implemented.

Distributed photovoltaic projects adopt post subsidy measures. The Municipal

Development and Reform Bureau is responsible for the allocation of special funds for

distributed photovoltaic projects in the city.

Dongguan Power Supply Bureau is responsible for the transfer and advance payment

of national subsidies for distributed photovoltaic projects throughout the city, among

which enterprise projects are subject to national disclosure

List of renewable resource subsidies and transfer them after the national subsidy funds

are allocated in place. Residential projects will follow the relevant regulations of China

Southern Power Grid

Regulations and subsidy time limit for advance payment.

Distributed photovoltaic power generation projects connected to the public grid, access

system engineering, and public grid renovation caused by access

Invested and constructed by Dongguan Power Supply Bureau. Connect to the

distributed photovoltaic power generation project on the user side, and the

supporting engineering on the user side will be carried out by the project

Unit investment and construction.

Dongguan Power Supply Bureau is responsible for measuring the total power

generation and grid connected electricity of distributed photovoltaic power generation

projects, providing and installing them for free

Electric energy metering meter. The services provided by Dongguan Power Supply

Bureau in all aspects related to grid connection and operation are not collected from

the project unit

Collect fees.

Distributed photovoltaic power generation projects that enjoy electricity subsidy

policies are responsible for monthly transfer of national subsidies to project units

by Dongguan Power Supply Bureau

Funds are used to settle the remaining electricity and electricity bills on a monthly basis.


工信部ICP备案:苏ICP备13036711号-1
Solartale wechat
Address: ****, Zhizhi Road, Huishan District, Wuxi City, Jiangsu Provience, P.R.China
      Email:20864032@qq.com; betty@solartale.com Mobile:0086 13812292809